Sebastopol Regional Library
Project Type: Libraries
Project Location: Sebastopol, CA
Client: NEI Corporation
Scope of Work: Work was successfully completed at the Sebastopol Regional Library, where we connected power and data to an outdoor mail locker system. The library provided junction boxes for each, with lines run to the installation point. Weather-tight connections were installed, and power was landed on the inside of the locker. The same was done for the Cat5, which had a male end terminated so it could be plugged directly into the computer. Our electrician ran new homeruns and flex conduits out of the new junction box and landed them in the knockouts of the new kiosk. The system is now fully operational.
Ready to Start Your Project?
Contact Us Today for a Free Quote